Prospector 1
Prospector 1 is a jack-up rig with drilling contractor Borr Drilling. Operating (contractor report). Last reported in Netherlands by Borr Drilling — fleet status report (SEC 6-K exhibit), report dated 2026-08-11.
As of the contractor's report dated 2026-08-11 (100 days ago).
Contract timeline
Dates as stated by the source; month-precision dates run to the end of the month. An option is not a commitment and may not be exercised. Nothing here says a contract is in force today.
Sign in free to see contract dates, well history and the exact position.
Reported location
Country only: Netherlands, as reported by the contractor on 2026-08-11. The marker is placed at a reference point for that country, not the rig's position. 53.500, 4.000, observed 2026-08-11. Source: Borr Drilling — fleet status report (SEC 6-K exhibit).
Sign in free to see contract dates, well history and the exact position.
Equipment (RigDNA)
Equipment appears only when a source documents it. Suppliers and contractors can send a published rig specification to [email protected].
Specifications
- Design
- F&G, JU2000E
- Rated water depth
- 400 ft
- Year built
- 2013
- Specification source
- Borr Drilling — fleet status report (SEC 6-K exhibit), report dated 2026-08-11
RigDNA: equipment and capability
Specifications as stated by each source on its stated date. Not verified, converted or inferred. Borr states its specification sheets are for general reference purposes only. The date shown is the date of the PDF file.
| Item | As stated | Source | Date on source | Captured |
|---|---|---|---|---|
| Design | Friede & Goldman JU2000E | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| Builder yard | Dalian Shipbuilding Industry Offshore Co., Ltd., China | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| Year entered service / upgrades | 2013 | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| Class society | ABS, A1, Self-Elevating Drilling Unit | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| Flag | Vanuatu | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| Item | As stated | Source | Date on source | Captured |
|---|---|---|---|---|
| Rated water depth | 400 ft. designed / 400 ft. outfitted | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| Drilling depth | 35,000 ft, 35,000ft | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| Hookload | 2,000,000 lbs gross nominal capacity | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| Derrick height | TTS/ Hot dipped galvanized; 194 ft high with 40 ft x 40 ft base | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| Cantilever reach | 75 ft aft of transom / 15 ft Port & 15ft Stbd | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| Variable deck load | 8,300 kips operating / 6,614kips transit (spud cans full) | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| Item | As stated | Source | Date on source | Captured |
|---|---|---|---|---|
| Top drive | Cameron TTS Sense Model STD-1000-AC-2M, 1,100 st load rating, 2300 hp AC motor. Max speed 275 RPM, max torque 98,000 ft/lbs. Max MU/BO 115,000 ft/lbs. (2) IBOP 3 ¼” 15K psi. Electro project soft torque system. | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| Drawworks | Cameron TTS Ultra hoist SG 1060-6000 Max hook load 2,120 kips with 16 lines. 4 x GE AC motors suitable for 2" drill line | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| Mud pump | quantity 3, (3) Wirth TPK 2200 triplex pumps, each driven by 2,200 hp (GE AC motor) 7,500 psi rated | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| BOP ram | quantity 1, (1) Cameron Double “U” ram 20-3/4" 3k psi BOP (1) Cameron Double “U” ram 13-5/8" 10k psi BOP (1) Cameron Single “U” ram 13-5/8” 10k psi BOP | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| BOP annular | quantity 1, (1) Shaffer Annular 21-1/4" 2k psi BOP (1) Hydril GK Annular 13-5/8" 5k psi BOP | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| Rotary table | Cameron 49.5" table opening, hydraulic drive, rated 1,000 st | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| Crane | quantity 3, (3) Liebherr cranes, 75mt capacity,120ft boom | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| Pipe handling | quantity 2, (2) Cameron TTS/JiM 10T LR, 4-3/4" to 9-3/4" OD drill pipe & drill collar Make-up torque 103,300ft-lb Break-out torque 147,500ft-lb (Fully mechanized). Spinning speed 80 RPM, spinning torque 3500 ft/lbs. | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| Power generation | quantity 6, (6) Caterpillar 3516C-HD diesel engines rated at 1,525hp at 1200rpm each with Caterpillar generator rated to 1,534kW. SCR E-Pot system installed on all main engines reducing exhaust emissions by min 90% NOx, PM by 80%, HC up to 90% and CO by 90%. | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
| Solids control | quantity 5, (5) NOV/VSM-300 shale shakers. (1) MI Swaco/Gumbo X chain conveyor. Conveyor system for OBM cutting disposal | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-15 |
Well history and drilling permits
Sign in free to see contract dates, well history and the exact position.
Related rigs
Questions about Prospector 1
What type of rig is Prospector 1?
Prospector 1 is a jack-up rig (F&G, JU2000E), according to Borr Drilling — fleet status report (SEC 6-K exhibit) (report dated 2026-08-11).
Where is Prospector 1?
Borr Drilling — fleet status report (SEC 6-K exhibit) last reported Prospector 1 in Netherlands on 2026-08-11. This is a reported location, not live tracking.
Which drilling contractor runs Prospector 1?
Borr Drilling is reported as the rig's contractor by Borr Drilling — fleet status report (SEC 6-K exhibit) (report dated 2026-08-11).
When was Prospector 1 built?
2013, according to Borr Drilling — fleet status report (SEC 6-K exhibit) (report dated 2026-08-11).
What water depth is Prospector 1 rated for?
400 ft, according to Borr Drilling — fleet status report (SEC 6-K exhibit) (report dated 2026-08-11).
Sources
- Borr Drilling — fleet status report (SEC 6-K exhibit) (status report dated 2026-08-11; reported position). Captured 2026-11-05
Source-reported information; not live tracking or a compliance determination. Positions are reported locations, not live tracking. See Data and sources.