Forseti
Forseti is a jack-up rig with drilling contractor Borr Drilling. Contracted, not yet started (contractor report). Last reported in United Arab Emirates by Borr Drilling — fleet status report (SEC 6-K exhibit), report dated 2026-08-11.
As of the contractor's report dated 2026-08-11 (100 days ago).
Contract timeline
Dates as stated by the source; month-precision dates run to the end of the month. An option is not a commitment and may not be exercised. Nothing here says a contract is in force today.
Sign in free to see contract dates, well history and the exact position.
Reported location
Country only: United Arab Emirates, as reported by the contractor on 2026-08-11. The marker is placed at a reference point for that country, not the rig's position. 24.800, 53.500, observed 2026-08-11. Source: Borr Drilling — fleet status report (SEC 6-K exhibit).
Sign in free to see contract dates, well history and the exact position.
Equipment (RigDNA)
Equipment appears only when a source documents it. Suppliers and contractors can send a published rig specification to [email protected].
Specifications
- Design
- F&G JU-3000N
- Rated water depth
- 400 ft
- Year built
- 2013
- Specification source
- Borr Drilling — fleet status report (SEC 6-K exhibit), report dated 2026-08-11
RigDNA: equipment and capability
Specifications as stated by each source on its stated date. Not verified, converted or inferred. Borr states its specification sheets are for general reference purposes only. The date shown is the date of the PDF file.
| Item | As stated | Source | Date on source | Captured |
|---|---|---|---|---|
| Design | Friede & Goldman JU3000N | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| Builder yard | Jurong Shipyard, Singapore | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| Year entered service / upgrades | 2013 | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| Class society | ABS +A1, Self-Elevating Drilling Unit | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| Flag | Liberia | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| Item | As stated | Source | Date on source | Captured |
|---|---|---|---|---|
| Rated water depth | 400 ft. designed / 400 ft. outfitted | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| Drilling depth | 35,000 ft, 35,000 ft | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| Hookload | 2,500,000 lbs gross nominal capacity | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| Derrick height | NOV / SSBN Derrick 210 ft. high, with 40 ft. x 45 ft. base | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| Cantilever reach | 70 / 30 ft (x-y skidding system) | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| Variable deck load | 11,885 kips operating / 13,016 kips transit | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| Item | As stated | Source | Date on source | Captured |
|---|---|---|---|---|
| Top drive | NOV TDX-1000, 1,000st static/dynamic load rating 1,150hp Electric AC motor. Max speed 250rpm, Max continuous torque 91,500 ft.-lbs. Max MU torque 125,000 ft-lbs, Max BU torque 150,000 ft-lbs | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| Drawworks | NOV SSGD-1250 AC motors suitable for 2" drill line | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| Mud pump | quantity 3, (3) NOV 14-P-220 triplex pumps, each driven by 2,200 hp electric motor 7,500 psi rated | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| BOP ram | quantity 2, (2) Cameron TL BOP double rams 18-3/4" 15,000 psi BOP | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| BOP annular | quantity 1, (1) Shaffer 18-3/4" 10,000 psi annular preventer | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| Rotary table | NOV RST-495 / 49-1/2” table opening Hydraulic drive, rated 1,000st | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| Crane | quantity 3, (3) NOV OC3000LCE electric / hydraulic, 75mt capacity (1) PC1891KCE knuckle boom crane, 5.5mt capacity | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| Pipe handling | quantity 1, (1) NOV Vertical column Racker PRS-6is (2) NOV ST160 Iron Roughneck | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| Power generation | quantity 5, (5) Caterpillar C-175 diesel engines rated 2,588hp at 1,200rpm each with AC generator rated to 2,287kW | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
| Solids control | quantity 5, (5) NOV Brandt VSM300 shale shakers | Borr Drilling — rig specification sheets (PDF) | date not stated | 2026-11-16 |
Well history and drilling permits
Sign in free to see contract dates, well history and the exact position.
Related rigs
Questions about Forseti
What type of rig is Forseti?
Forseti is a jack-up rig (F&G JU-3000N), according to Borr Drilling — fleet status report (SEC 6-K exhibit) (report dated 2026-08-11).
Where is Forseti?
Borr Drilling — fleet status report (SEC 6-K exhibit) last reported Forseti in United Arab Emirates on 2026-08-11. This is a reported location, not live tracking.
Which drilling contractor runs Forseti?
Borr Drilling is reported as the rig's contractor by Borr Drilling — fleet status report (SEC 6-K exhibit) (report dated 2026-08-11).
When was Forseti built?
2013, according to Borr Drilling — fleet status report (SEC 6-K exhibit) (report dated 2026-08-11).
What water depth is Forseti rated for?
400 ft, according to Borr Drilling — fleet status report (SEC 6-K exhibit) (report dated 2026-08-11).
Sources
- Borr Drilling — fleet status report (SEC 6-K exhibit) (status report dated 2026-08-11; reported position). Captured 2026-11-05
Source-reported information; not live tracking or a compliance determination. Positions are reported locations, not live tracking. See Data and sources.