Operating (contractor report)

Grid

Grid is a drilling rig with drilling contractor Borr Drilling. Operating (contractor report). Last reported in Angola by Borr Drilling — fleet status report (SEC 6-K exhibit), report dated 2026-08-11.

As of the contractor's report dated 2026-08-11 (100 days ago).

Contract timeline

Dates as stated by the source; month-precision dates run to the end of the month. An option is not a commitment and may not be exercised. Nothing here says a contract is in force today.

Reported location

Reported position basis: area reference point, not the rig's exact position. Not live tracking.

Country only: Angola, as reported by the contractor on 2026-08-11. The marker is placed at a reference point for that country, not the rig's position. -7.500, 12.000, observed 2026-08-11. Source: Borr Drilling — fleet status report (SEC 6-K exhibit).

Equipment (RigDNA)

Top driveNot yet documented
Mud pumpsNot yet documented
Shale shakersNot yet documented
BOPNot yet documented

Equipment appears only when a source documents it. Suppliers and contractors can send a published rig specification to [email protected].

Specifications

Design
PPL Pacific Class 400
Rated water depth
400 ft
Year built
2018
Specification source
Borr Drilling — fleet status report (SEC 6-K exhibit), report dated 2026-08-11

RigDNA: equipment and capability

Specifications as stated by each source on its stated date. Not verified, converted or inferred. Borr states its specification sheets are for general reference purposes only. The date shown is the date of the PDF file.

Identity
ItemAs statedSourceDate on sourceCaptured
DesignPPL Pacific Class 400Borr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
Builder yardPPL Shipyard PTE Ltd. , SingaporeBorr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
Year entered service / upgrades2018Borr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
Class societyABS,A1, Self-Elevating Drilling UnitBorr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
FlagLiberiaBorr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
Capability
ItemAs statedSourceDate on sourceCaptured
Rated water depth400 ft. designed / 400 ft. outfittedBorr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
Drilling depth30,000 ft, 30,000ftBorr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
Hookload1,500,000lbs gross nominal capacityBorr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
Derrick heightLoadmaster Derrick 160 ft. high, with 35 ft. x 35 ft. baseBorr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
Cantilever reach75 ft / 15 ft Port & StbdBorr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
Variable deck load8,208 kips operating / 4,998 kips transit (spud cans full)Borr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
Equipment
ItemAs statedSourceDate on sourceCaptured
Top driveCameron FD35, 750st static/dynamic load rating 1150hp AC motor GE. Max speed 274rpm, Max torque 66,000 ft.-lbs. Max MU/BO torque 115,000ft-lbs, (2) IBOP 3 1/16" – 15kBorr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
DrawworksCameron Ultrahoist 750-3000(FA30) Max hook load 750st with 14 lines. 2 x GE AC motors suitable for 1-5/8" drill lineBorr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
Mud pumpquantity 3, (3) Lewco W2214 triplex pumps, each driven by 1150 hp (GE AC motor) 7,500 psi ratedBorr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
BOP ramquantity 2, (2) Cameron double rams 18-3/4" 15k psi BOPBorr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
BOP annularquantity 1, (1) Cameron 18-3/4" 10,000psi annular preventerBorr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
Rotary tableCameron 49-1/2" table opening, hydraulic drive, rated 750stBorr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
Cranequantity 3, (3) Favello Favco cranes, 55.1st capacity,120ft boomBorr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
Pipe handlingCameron JiM 10 T-P-L, 3-1/2" to 9-3/4" OD drill pipe & drill collar Make-up torque 103,300ft-lb Break-out torque 103,300ft-lb Spinning speed 0-80 rpm (with 5" OD) Spinning torque 3,500ft-lbsBorr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
Power generationquantity 5, (5) Caterpillar 3516C-HD diesel engines rated at 2,150hp at 1200rpm each with Kato generator rated to 2,150KVABorr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15
Solids controlquantity 4, (4) NOV Brandt VSM 300 shaleshakers. Mud cleaner installed over one shale shaker.Borr Drilling — rig specification sheets (PDF)file date 2026-10-212026-11-15

Well history and drilling permits

Questions about Grid

Where is Grid?

Borr Drilling — fleet status report (SEC 6-K exhibit) last reported Grid in Angola on 2026-08-11. This is a reported location, not live tracking.

Which drilling contractor runs Grid?

Borr Drilling is reported as the rig's contractor by Borr Drilling — fleet status report (SEC 6-K exhibit) (report dated 2026-08-11).

When was Grid built?

2018, according to Borr Drilling — fleet status report (SEC 6-K exhibit) (report dated 2026-08-11).

What water depth is Grid rated for?

400 ft, according to Borr Drilling — fleet status report (SEC 6-K exhibit) (report dated 2026-08-11).

Sources

Source-reported information; not live tracking or a compliance determination. Positions are reported locations, not live tracking. See Data and sources.